Installation On Grade

 
 
Step 1 recycled concrete on grade.JPG

Step 1 recycled concrete on grade.

Large JPG-20140228_Trade 151_0046.jpg

Step 2 sand filler.

Step 3 leveling recycled concrete.JPG

Step 3 leveling recycled concrete.

20140301_Trade-151_0124-copy.jpg

Step 4 tire compacting.

Step 5 geotextile over concrete.JPG

Step 5 geotextile over concrete.

Step 6 EPDM liner and base ribs.JPG

Step 6 EPDM liner and base ribs.

 
Step 7 Move in.JPG
 
 

Move in.

Previous
Previous

Greenhouse Installation